Polyester Cartoon Printed Kids Swimming Suit | Half Sleeve | Zip Closure | XL | 6-8 Year | Assorted Colors | OPP Packing

About This Article:-

  • Made from soft and lightweight polyester fabric.
  • Comfortable to wear for long swimming session.
  • Attractive cartoon prints kids will love.
  • Half sleeves for extra coverage and protction.
  • Easy back side zip closure for quick wear and removal.
  • Quick drying material, perfect for water use.
  • Suitable for kids aged 6-8 year (XL Size).
  • Ideal for swimming pool, beach, and water activities.
  • Assorted colors & prints.
  • OPP Packing.
SKU: RK-SWIMMING-SUIT Categories: , Tags: , ,

Description

Cartoon Printed Kids Swimming Suit

Make swim time fun and comfortable for your child with this cute cartoon printed kids swimming suit. It is made from soft polyester fabric that feels light on the skin and dries quickly.

The half sleeves provides extra coverage, while the back side zip closure makes it easy to wear and remove. Also the fun cartoon design and assorted colors make it attractive for kids.

This swimming suit is perfect for children ages 6 to 8 year (XL Size). Also it is ideal for swimming classes, pool fun, or beach outings.

Product Features:-

  • Soft and lightweight polyester material.
  • Cute cartoon print kids love.
  • Half sleeves for better comfort and protection.
  • East to use back size zip closure.
  • Suitable for 6-8 years (XL Size).
  • Comes in assorted colors.
  • Packed in secure OPP packaging.

Reviews

There are no reviews yet.

Be the first to review “Polyester Cartoon Printed Kids Swimming Suit | Half Sleeve | Zip Closure | XL | 6-8 Year | Assorted Colors | OPP Packing”

Your email address will not be published. Required fields are marked *

You may also like…